Technical specialist training
Engineers, operators, mechanics, electricians and instrumentation specialists
Fixing leaks could bring about 200 bcm of gas a year to market, double what the Hormuz closure took out. Most of the work sits in the maintenance plan.
Nearly half of Gulf operators say up to half their assets run past design life. How to check the assumptions, calculate remaining life and decide with an owner and a date.
ReadBudget cuts in January, production at any cost in March. How to avoid both mistakes and find the savings that don't add risk.
ReadA quick test for operations and maintenance engineers. The AI answer looks right, but one of its mistakes is off by a factor of ten. The breakdown, a prompt template and a checklist you can use at work.
Read
{{ count }} comments