Technical specialist training
Engineers, operators, mechanics, electricians and instrumentation specialists
Coiled tubing drilling represents a fundamentally new approach to solving challenges inherent in the oil and gas industry. Designed for extending wellbore reach or sidetracking in gas and oil wells up to depths of 6,000 meters, this technology was invented in the 1950s but gained widespread popularity only by the late 1980s.
Simulator development and pilot for a national oil and gas company in Saudi Arabia
ReadCasing cementing is one of the most critical stages in the development of an oil or gas well. It involves filling the annular space between the casing and the wellbore wall with a specialized cement slurry. Once hardened, this slurry provides the strength and integrity necessary to secure the casing in place.
Read
{{ count }} comments