Technical specialist training
Engineers, operators, mechanics, electricians and instrumentation specialists
Technical programmes
Core business skills
Digital skills
Health, safety and environment
Science, technology and mathematics
Engineers, operators, mechanics, electricians and instrumentation specialists
Preparing personnel for facility start-up
Staged training with practice and assessment
Role profiles, assessment and development plans
Learning portal, online courses and simulators
Managers, project teams and support functions
A Modern Framework for High-Performance Well Delivery
Ayman KhaledCasing cementing is one of the most critical stages in the development of an oil or gas well. It involves filling the annular space between the casing and the wellbore wall with a specialized cement slurry. Once hardened, this slurry provides the strength and integrity necessary to secure the casing in place.
Stuck pipe incidents are among the most common and time-consuming complications in drilling operations. Addressing these issues promptly is essential to minimize downtime and reduce operational costs. This article discusses the causes of stuck pipe, preventive measures, and the tools and techniques used in fishing operations to restore normal drilling activities.
Coiled tubing drilling represents a fundamentally new approach to solving challenges inherent in the oil and gas industry. Designed for extending wellbore reach or sidetracking in gas and oil wells up to depths of 6,000 meters, this technology was invented in the 1950s but gained widespread popularity only by the late 1980s.
The recent surge in accidents and injuries during drilling operations has become a significant concern in the oil and gas industry. This alarming trend has prompted major equipment suppliers, manufacturers, partners, and clients to focus intensely on compliance with safety regulations.